New Project( Finished !)

i did it in the dinning room, muym isnt home much so the house is basicly my own. i just totaled it all up and if i had the tools it would have cost me around
70 for wood
30 for paint
40 for pipework
30 for external
i rekon all in all its cost around 200 but over 5 months its next to nothing
if i had to do the whole project again i would have brought better wood. and i think i could possibly complete it in around a week tops lol
remember this was my first attempt at wood work since leaving school about 6 years ago.
its more than likely they i will be re doing the hood this summer out in the garden not total sure tho.
i live in Nottingham.
once i get my own house some time this or next year i plan on creating a much larger version. i even had thoughts of a 2 story version gotta work out how all the piping could work but im sure its doable?
 
i did it in the dinning room, muym isnt home much so the house is basicly my own. i just totaled it all up and if i had the tools it would have cost me around
70 for wood
30 for paint
40 for pipework
30 for external
i rekon all in all its cost around 200 but over 5 months its next to nothing
if i had to do the whole project again i would have brought better wood. and i think i could possibly complete it in around a week tops lol
remember this was my first attempt at wood work since leaving school about 6 years ago.
its more than likely they i will be re doing the hood this summer out in the garden not total sure tho.
i live in Nottingham.
once i get my own house some time this or next year i plan on creating a much larger version. i even had thoughts of a 2 story version gotta work out how all the piping could work but im sure its doable?

Coolio....I always thought a 2 room version would be pretty good.........as in the pipe going from one room to another.
 

Most reactions

Back
Top