im sure the guys name is stephen something...i remember reading it somewhere, well im sure someone will come along and confirm it! and english call "smokes" fags because...im not going to write this just take a wee look here
well its definitely coming along, hope you manage to get up some pictures.
is the sump in? i just assume the sump would have to be in place before the front is bricked up?
also all the pipework, is all that in place already? i would have thought it would be hard to do it at the end!
did you manage to get the door insulated or you not bothering until closer to the fill up date??
im assuming the heating on the floor is the hot water type? or is it electric? electric would cost a fair bit more to run than the hot water type, you just lying the pipe onto the floor and putting your flooring down over it?
ah right didn't know the sump went in the same time, so the pumps will be already in situ? i suppose it wouldn't be that hard to get to as you'll need to get to it for maintainance etc
looks good, a good brick layer!!
best hope nothing ever happens to the sump, the wall would have to come down to move it! haha
how many days now until you can add water? do you still want this arowana? apparently no one else does!