T1...just getting back here. Can you PM me and fill me in to help me catch up. Last I saw you was just after the build; you had some leaking issues and then medical issues. SH
I spent 4 hours reading this thread yesterday and I have to say I am extremely jealous
That is a superb piece of work - pity that ND let you down on the plumbing.
All you need to do now is have a heated, glazed and covered walkway - with sliding doors so you can cut the grass either side of it
Mind you that would probably cost another £10k in itself.
The workmanship is excellent and your fish stock superb.
I hope that you and your good lady enjoy it and that you enjoy good health from here on in after what you have been through.
Looks like you have everything covered. The only thing I can think of would be some form of UPS system in case of a powercut - or was that included? Can't recall off the top of my head.
Oh by the way, how are the "pups"? Are they growing nicely?