gaya
Fish Addict
As some of you know I wanted to build a water bridge between my two 30g tanks but one of the tank stands is much lower than the other so I gave up on it for now. Instead I’ve decided to do it with two 10g tanks. They were much easier to move.
Here are the two tanks, which are dwarf puffer tanks so I'm unsure what they’ll think of it but I plan to have a few ottos in there so maybe they’ll like the option of a bridge.
Here are some of the parts. I purchased the white pvc elbows at home depot and the clear tubing is from a large gravel vac. Will this work? I don’t know. But it is pvc. There is clear pvc and fittings I could have picked up locally but it was really expensive. What I have now cost maybe $15.
Here is the bridge somewhat assembled. One of the pieces is currently being used as a tunnel/cave for the puffers but I will drag it out tomorrow. I will use aqua sealant in the joints as well. Hopefully that will provide some extra protection.
I still need to build a base for the bridge. I intend to use clasps and brackets. I was hoping to get this done b4 classes start (Tuesday) but it seems unlikely. I’ll keep this journal updated and let you know what kind of mess I make.![Smile :) :)](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
Here are the two tanks, which are dwarf puffer tanks so I'm unsure what they’ll think of it but I plan to have a few ottos in there so maybe they’ll like the option of a bridge.
![twotanks6pe.jpg](/proxy.php?image=http%3A%2F%2Fimg162.exs.cx%2Fimg162%2F9274%2Ftwotanks6pe.jpg&hash=7fc5995c40b2aab81c90a3e258e74b5b)
Here are some of the parts. I purchased the white pvc elbows at home depot and the clear tubing is from a large gravel vac. Will this work? I don’t know. But it is pvc. There is clear pvc and fittings I could have picked up locally but it was really expensive. What I have now cost maybe $15.
![parts1hh.jpg](/proxy.php?image=http%3A%2F%2Fimg162.exs.cx%2Fimg162%2F1601%2Fparts1hh.jpg&hash=90d6781054052c2603d3847a2f345e4a)
Here is the bridge somewhat assembled. One of the pieces is currently being used as a tunnel/cave for the puffers but I will drag it out tomorrow. I will use aqua sealant in the joints as well. Hopefully that will provide some extra protection.
![bridge3np.jpg](/proxy.php?image=http%3A%2F%2Fimg162.exs.cx%2Fimg162%2F1581%2Fbridge3np.jpg&hash=bd6dc5ab290b28d13816de2aaa24c6e1)
I still need to build a base for the bridge. I intend to use clasps and brackets. I was hoping to get this done b4 classes start (Tuesday) but it seems unlikely. I’ll keep this journal updated and let you know what kind of mess I make.