I bought a HM Digital DM-2EC Commercial in-Line Dual EC Monitor. to install on a 5 stage RO/DI system.
Question is:
Where would you install the sensors.
1: One after the membrane and one after the DI resin, So the last reading is what is going in the tank.
2: One before the membrane and one before the DI resin and use my Pen EC to verify the water in the tank. And have a EC reading for before membrane and before DI resin.
If this makes any sense.
Question is:
Where would you install the sensors.
1: One after the membrane and one after the DI resin, So the last reading is what is going in the tank.
2: One before the membrane and one before the DI resin and use my Pen EC to verify the water in the tank. And have a EC reading for before membrane and before DI resin.
If this makes any sense.